1/27/2022 5:18 PM <dir> 01 Novel Lockwood - Construction Set
8/9/2021 7:57 PM <dir> 02 Novel Lockwood - 98-Percent Set
8/9/2021 7:56 PM <dir> 03 Novel Lockwood - 85-Percent GMP Set
8/9/2021 7:55 PM <dir> 04 Novel Lockwood - 60-Percent Progress Set
8/9/2021 7:55 PM <dir> 05 Novel Lockwood - 50-Percent CD Set
8/9/2021 7:54 PM <dir> 06 Novel Lockwood
8/9/2021 7:54 PM <dir> 111 N Tryon Parking Deck
10/11/2022 3:36 PM <dir> _Template
8/18/2022 4:29 PM <dir> Axial - Bond Farms
10/25/2022 9:29 AM <dir> Axial - Red Oaks
2/23/2022 12:47 PM <dir> Axial Crosspoint
8/9/2021 7:53 PM <dir> Crescent 101 Tryon Exterior and Interior Improvements GMP
12/15/2022 11:37 AM <dir> Crescent Carson Station - Design Development Set
6/16/2022 8:06 AM <dir> Crescent Carson Station - Schematic Design Set
7/1/2022 7:53 AM <dir> Crescent Comm Heritage - 100-Percent Documents
6/14/2022 8:38 AM <dir> Crescent Comm Heritage - 85-Percent Documents
12/19/2022 4:03 PM <dir> Crescent Finger Mill - 60-Percent Set
8/9/2021 7:52 PM <dir> Crescent Highland - 100-Percent CD Set
8/9/2021 7:51 PM <dir> Crescent Highland - 2nd City Submittal
8/9/2021 7:49 PM <dir> Crescent Highland - 3rd City Submittal
8/9/2021 7:46 PM <dir> Crescent Highland - Construction Set
3/18/2022 12:42 PM <dir> Crescent Kimball Bridge - DD Set
6/23/2022 10:02 AM <dir> Crescent Kimball Bridge - GMP Set
12/21/2021 11:08 AM <dir> Crescent Martins Crossing - Design Development Set
2/23/2022 11:04 AM <dir> Crescent Monarch Food Hall
8/9/2021 7:46 PM <dir> Crescent Oakview - DD Set
8/18/2022 3:52 PM <dir> Crescent Render Manchester Farms - 50-Percent CD and GMP Set
1/31/2022 10:00 AM <dir> Crescent Render Manchester Farms - Design Development Set
9/20/2021 2:57 PM <dir> Crescent Render Prototype - Design Development Set
12/21/2021 11:06 AM <dir> Crescent Render Sarasota - Design Development Set
12/14/2021 3:56 PM <dir> Crescent River District Charlotte International Office - SD Drawing Set
3/25/2022 10:10 AM <dir> Crescent Westrow Mixed Use - DD Set
8/9/2021 7:46 PM <dir> Elizabeth on 7th Street - 85-Percent CD Set
12/22/2021 12:40 PM <dir> Elizabeth on 7th Street - IFC Set
7/28/2021 2:31 PM <dir> Foxbank
8/9/2021 7:43 PM <dir> Lakemont 4
8/9/2021 7:43 PM <dir> Lakemont Business Park
8/9/2021 7:43 PM <dir> Lakemont East Industrial
9/22/2021 2:52 PM <dir> Manatee Business Center - GMP Documents
8/9/2021 7:42 PM <dir> Novel 101 N Tryon Exterior Improvements
8/9/2021 7:42 PM <dir> Novel 101 N Tryon Interiors - 50-Percent CD Set
8/9/2021 7:42 PM <dir> Novel 101 N Tryon Interiors - GMP Set
8/9/2021 7:42 PM <dir> Novel 14th and Spring Street
8/9/2021 7:42 PM <dir> Novel 14th and Spring Street - Pricing Set
3/18/2022 1:31 PM <dir> Novel 14th Street - 50-Percent CD Submission
3/10/2023 9:22 AM <dir> Novel 14th Street - 98-Percent CD Submission
11/15/2021 10:05 AM <dir> Novel 14th Street - Design Development Submission
10/27/2022 12:52 PM <dir> Novel 14th Street - GMP Submission
9/7/2021 10:41 AM <dir> Novel 14th Street - Schematic Design Submission
8/9/2021 7:34 PM <dir> Novel 2 Eye Street - Construction Set
8/9/2021 7:34 PM <dir> Novel 2 Eye Street - Retail
8/9/2021 7:34 PM <dir> Novel 2 Eye Street - Schematic Design Set
8/9/2021 7:33 PM <dir> Novel 2 Eye Street Phase II - Permit Set
1/3/2018 9:18 AM <dir> Novel 4 Eye St
8/9/2021 7:33 PM <dir> Novel 4 Eye St - GMP Set
8/9/2021 7:31 PM <dir> Novel 4 Eye St - IFC Set
8/9/2021 7:29 PM <dir> Novel 9th Street
8/9/2021 7:28 PM <dir> Novel Alexander Village
8/9/2021 7:27 PM <dir> Novel Atherton Mill - 3rd Party Consultants For Reference
8/9/2021 7:20 PM <dir> Novel Atherton Mill - GMP Set
8/9/2021 7:19 PM <dir> Novel Atherton Mill Axiom - DD Set
8/17/2021 7:56 AM <dir> Novel Ballantyne - 50-Percent CD Review Set
1/10/2022 3:24 PM <dir> Novel Ballantyne - 90-Percent CD Set
8/16/2021 11:20 AM <dir> Novel Ballantyne - DD Review Set
5/11/2022 11:00 AM <dir> Novel Ballantyne - IFC Set
8/9/2021 7:16 PM <dir> Novel Ballantyne - Schematic Design
8/9/2021 7:15 PM <dir> Novel Bayshore
10/17/2022 2:56 PM <dir> Novel Beach Park - 98-Percent Construction Documents
12/8/2021 10:39 AM <dir> Novel Beach Park - Building Permit Documents
4/12/2022 12:58 PM <dir> Novel Beach Park - GMP and RediCheck Set
8/9/2021 7:15 PM <dir> Novel Beach Park - Schematic Design Set
8/9/2021 7:14 PM <dir> Novel Beach Park Apts -100-Percent Design Development Set
8/3/2021 2:06 PM <dir> Novel Beach Park Apts -33-Percent CD Set
8/9/2021 7:12 PM <dir> Novel Bellevue
8/9/2021 7:09 PM <dir> Novel Bellevue - 100-Percent CD Set
8/9/2021 7:09 PM <dir> Novel Bellevue - Mock Up
8/9/2021 7:07 PM <dir> Novel Bellevue GMP Set
8/9/2021 7:06 PM <dir> Novel Bishop Arts - 50-Percent CD Set
8/9/2021 7:03 PM <dir> Novel Bishop Arts - Construction Set
8/9/2021 7:02 PM <dir> Novel Bishop Arts - DD Set
8/9/2021 7:00 PM <dir> Novel Bishop Arts - Final Set
8/9/2021 6:56 PM <dir> Novel Bishop Arts - GMP Set
8/9/2021 6:56 PM <dir> Novel Bishop Arts - Schematic Design
8/9/2021 6:45 PM <dir> Novel Boulder - Armory
8/9/2021 6:37 PM <dir> Novel Boulder Armory - GMP Set
8/9/2021 6:34 PM <dir> Novel Cameron Village
8/9/2021 6:34 PM <dir> Novel Cameron Village - Phase II
8/9/2021 6:31 PM <dir> Novel Cary - 50-Percent CD Progress Set
8/9/2021 6:19 PM <dir> Novel Cary - CD GMP Set
8/9/2021 6:17 PM <dir> Novel Cary - Design Development Set
8/9/2021 6:17 PM <dir> Novel Cary - Schematic Design Set
8/9/2021 6:12 PM <dir> Novel Central Station
8/9/2021 6:12 PM <dir> Novel Charterwood
8/9/2021 6:12 PM <dir> Novel Circle at Southpark - Closeout Documents
8/9/2021 6:07 PM <dir> Novel Circle University
2/24/2022 8:51 AM <dir> Novel Colorado Station - SD Set
8/9/2021 6:07 PM <dir> Novel Davidson - Design Development Set
8/9/2021 6:07 PM <dir> Novel Davidson - DD Progress Set
3/10/2023 12:35 PM <dir> Novel Davidson - ReBoot
8/9/2021 6:07 PM <dir> Novel Davidson - SD Package
8/9/2021 6:03 PM <dir> Novel Daybreak - 50-Percent CD-Permit Issue
8/9/2021 5:56 PM <dir> Novel Daybreak - 90-Percent CD-Permit-GMP Set
8/9/2021 5:54 PM <dir> Novel Daybreak - Design Development Set
12/13/2022 8:43 AM <dir> Novel Daybreak - Final IFC Set
8/9/2021 5:51 PM <dir> Novel Daybreak - GMP Set - Crescent Access Only
8/9/2021 5:47 PM <dir> Novel Daybreak - IFC Set
8/9/2021 5:46 PM <dir> Novel Daybreak - Schematic Design Set
8/9/2021 5:45 PM <dir> Novel Deep Ellum - 50-Percent CD
8/9/2021 5:45 PM <dir> Novel Deep Ellum - DD Submission
8/9/2021 5:40 PM <dir> Novel Deep Ellum - GMP Set
8/9/2021 5:34 PM <dir> Novel Deep Ellum - IFC Set
8/9/2021 5:30 PM <dir> Novel Deep Ellum - Permit Set
8/9/2021 5:30 PM <dir> Novel Deep Ellum - Schematic Design Submission
8/9/2021 5:24 PM <dir> Novel Dilworth - RTAP Set
8/9/2021 5:22 PM <dir> Novel Eckington Yards
8/9/2021 5:17 PM <dir> Novel Eckington Yards - 85-Percent Set
8/9/2021 5:15 PM <dir> Novel Edgehill - 70-Percent CD Set
8/9/2021 5:13 PM <dir> Novel Edgehill - 80-Percent CD Set
8/9/2021 5:09 PM <dir> Novel Edgehill - 99-Percent CD Set
8/9/2021 5:08 PM <dir> Novel Edgehill - Design Development Set
8/9/2021 5:08 PM <dir> Novel Edgehill - Footing and Foundation Permit
8/10/2022 10:46 AM <dir> Novel Edgehill - IFC Set
8/9/2021 5:05 PM <dir> Novel Edgehill - Schematic Design Set
8/9/2021 5:02 PM <dir> Novel Gateway Construction Set
8/9/2021 5:01 PM <dir> Novel Harpeth Heights - 50-Percent CD Set
8/9/2021 4:58 PM <dir> Novel Harpeth Heights - 85-Percent Submittal Set
8/9/2021 4:54 PM <dir> Novel Harpeth Heights - 99-Percent GMP Set
8/9/2021 4:51 PM <dir> Novel Harpeth Heights - Building Permit Submittal Set
8/10/2022 10:53 AM <dir> Novel Harpeth Heights - Construction Set
8/9/2021 4:42 PM <dir> Novel Harpeth Heights - Design Development Set
8/9/2021 4:41 PM <dir> Novel Harpeth Heights - Footing and Foundation Permit Set
8/9/2021 4:38 PM <dir> Novel Harpeth Heights - IFC Set 05-25-21
5/2/2022 12:53 PM <dir> Novel Heritage - 50-Percent CD-Permit Documents
12/20/2022 10:32 AM <dir> Novel Heritage - 95-Percent Construction Documents
3/17/2022 2:29 PM <dir> Novel Heritage - DD Set
12/20/2022 8:43 AM <dir> Novel Heritage - GMP Set
8/9/2021 4:28 PM <dir> Novel Howell Mill
11/7/2022 5:10 PM <dir> Novel Independence Park - 100-Percent IFC Set
8/16/2021 9:23 AM <dir> Novel Independence Park - 50-Percent CD Set
8/2/2022 10:19 AM <dir> Novel Independence Park - 99-Percent CD Set
8/9/2021 4:27 PM <dir> Novel Independence Park - Design Development Package
9/13/2021 10:11 AM <dir> Novel Independence Park - Permit-GMP Set
8/9/2021 4:27 PM <dir> Novel Indy Park - Schematic Design Set
8/9/2021 4:25 PM <dir> Novel Lake Nona - DD Drawings 08-21-20
8/9/2021 4:23 PM <dir> Novel Lake Nona - Design Development Set
8/9/2021 4:19 PM <dir> Novel Lake Nona - GMP Set
8/9/2021 4:19 PM <dir> Novel Lake Nona - Schematic Design Set
8/9/2021 4:18 PM <dir> Novel Lenox
10/25/2021 2:17 PM <dir> Novel LoSo - Current Running Set
8/9/2021 4:10 PM <dir> Novel LoSo - Design Development Set
8/9/2021 4:07 PM <dir> Novel LoSo - Permit-GMP Set
8/9/2021 4:07 PM <dir> Novel LoSo - Schematic Design Set
8/9/2021 3:58 PM <dir> Novel Lucerne - Construction Set
8/9/2021 3:51 PM <dir> Novel Lucerne - GMP Set
8/9/2021 3:51 PM <dir> Novel Lucerne - Grocer Upfit
9/20/2021 12:34 PM <dir> Novel Mallard Creek - 50-Percent CD Drawings
4/12/2022 10:57 AM <dir> Novel Mallard Creek - Carriage Homes - Permit GMP Set
2/21/2022 4:23 PM <dir> Novel Mallard Creek - Carriage Homes 50-Percent CD Set
8/26/2021 11:00 AM <dir> Novel Mallard Creek - DD Submission
6/6/2022 11:24 AM <dir> Novel Mallard Creek - IFC Submission
3/17/2022 11:43 AM <dir> Novel Mallard Creek - Permit GMP Set
8/9/2021 3:49 PM <dir> Novel Mallard Creek - SD Package
8/9/2021 3:47 PM <dir> Novel Midtown - 30-Percent CD Set
8/9/2021 3:44 PM <dir> Novel Midtown - 50-Percent CD Set
8/9/2021 3:41 PM <dir> Novel Midtown - Design Development Package
8/9/2021 3:39 PM <dir> Novel Midtown - Schematic Design Package
8/9/2021 3:36 PM <dir> Novel Midtown ATL - Pre-GMP Set
8/9/2021 3:36 PM <dir> Novel Midtown ATL - SD Set
8/9/2021 3:36 PM <dir> Novel Midtown ATL Linear Park - Phase 4
8/2/2022 3:05 PM <dir> Novel Midtown ATL Podium HKS Phase 1b - CD Set
8/9/2021 3:31 PM <dir> Novel Midtown ATL Podium NBA Phase 1a - CD Set
8/9/2021 3:29 PM <dir> Novel Midtown ATL Podium NBA Phase 1a - GMP Set
8/2/2022 3:04 PM <dir> Novel Midtown ATL Tower Phase 2 - CD Set
8/9/2021 3:20 PM <dir> Novel Midtown Atlanta - DD Set
8/9/2021 3:14 PM <dir> Novel Midtown Atlanta - GMP Set
8/9/2021 3:14 PM <dir> Novel Midtown Atlanta - SD Set
8/9/2021 3:13 PM <dir> Novel Midtown Coffee Shop
2/3/2022 4:21 PM <dir> Novel Midtown PHX - IFC Set
8/9/2021 3:01 PM <dir> Novel Midtown PHX - Permit-GMP Set
8/9/2021 3:01 PM <dir> Novel Midtown Tampa - ASI 1 IFC Structure
8/9/2021 2:59 PM <dir> Novel Midtown Tampa - ASI 2 IFC
8/9/2021 2:59 PM <dir> Novel Midtown Tampa - ASI 3 IFC
8/9/2021 2:59 PM <dir> Novel Midtown Tampa - ASI 4 IFC
3/17/2022 1:12 PM <dir> Novel Midtown Tampa - Current Running Set
8/9/2021 2:50 PM <dir> Novel Midtown Tampa - Permit-GMP Set
8/9/2021 2:50 PM <dir> Novel Millcreek - Conceptual Design Set
8/9/2021 2:46 PM <dir> Novel Montford Park - Current Set
4/12/2022 12:19 PM <dir> Novel Morrisville - 50-Percent CD Set
2/21/2022 1:50 PM <dir> Novel Morrisville - DD Package
8/9/2022 7:34 AM <dir> Novel Morrisville - GMP Submission
2/14/2023 12:28 PM <dir> Novel Morrisville - IFC Consolidated
12/19/2022 3:20 PM <dir> Novel Morrisville - IFC Submission
12/7/2021 3:31 PM <dir> Novel Morrisville - SD Submission
8/9/2021 2:36 PM <dir> Novel Music Row
8/9/2021 2:35 PM <dir> Novel Nashville West - DD Set
8/9/2021 2:32 PM <dir> Novel Nashville West - IFC
8/9/2021 2:30 PM <dir> Novel Nashville West - Permit-GMP Set
8/9/2021 2:30 PM <dir> Novel Nashville West - Progress Set
8/9/2021 2:30 PM <dir> Novel Nashville West - Schematic Design Set
8/9/2021 2:20 PM <dir> Novel NoDa - Current Running Set
8/9/2021 2:20 PM <dir> Novel NoDa Retail
8/9/2021 2:19 PM <dir> Novel NoDa Retail - Current Running Set
8/9/2021 2:19 PM <dir> Novel NoDa Retail - Permit Set
8/9/2021 2:19 PM <dir> Novel NoDa Retail - Pricing Set
8/16/2021 4:37 PM <dir> Novel Nona - 98-Percent IFC Set
8/17/2021 12:55 PM <dir> Novel Nona - Final IFC Set
8/9/2021 2:08 PM <dir> Novel North Fairfax - Due Diligence Drawings
8/9/2021 2:03 PM <dir> Novel Northgate
8/9/2021 2:02 PM <dir> Novel O4W - 50-Percent Construction Set
11/8/2021 1:21 PM <dir> Novel O4W - Construction Set
8/9/2021 1:55 PM <dir> Novel O4W - Design Development
8/9/2021 1:55 PM <dir> Novel O4W - Foundation Permit
8/9/2021 1:54 PM <dir> Novel O4W - GMP Set
8/9/2021 1:54 PM <dir> Novel Oakview - Phase 1
8/9/2021 1:53 PM <dir> Novel Park West
8/9/2021 1:52 PM <dir> Novel Parkway - 100-Percent Design Development Set
8/9/2021 1:49 PM <dir> Novel Parkway - 75-Percent CD Permit GMP Set
2/15/2022 4:05 PM <dir> Novel Parkway - 98-Percent CD Set
8/9/2021 1:45 PM <dir> Novel Perimeter - Current Set
8/9/2021 1:44 PM <dir> Novel Perimeter - GMP Set
8/9/2021 1:41 PM <dir> Novel Providence Farm - 08-31-16 Pricing Set
8/9/2021 1:38 PM <dir> Novel Providence Farm - 100-Percent IFC
8/9/2021 1:36 PM <dir> Novel Providence Farm - Closeout Set
8/9/2021 1:36 PM <dir> Novel Providence Farm - DD Set
8/9/2021 1:34 PM <dir> Novel Providence Farm - March 8 Progress Set
8/9/2021 1:33 PM <dir> Novel Providence Farm - Mecklenburg County Permit Approval Set
8/9/2021 1:32 PM <dir> Novel Providence Farm - RTAP Set
8/9/2021 1:31 PM <dir> Novel Research Park - Approved Permit Set
8/9/2021 1:31 PM <dir> Novel Research Park - CMC - Permit Set
8/9/2021 1:30 PM <dir> Novel Research Park - County Approved Stamped Drawings Only
8/9/2021 1:29 PM <dir> Novel Research Park - IFC Set
8/9/2021 1:28 PM <dir> Novel Research Park 98-Percent Construction Set
8/9/2021 1:26 PM <dir> Novel RiNo - Consolidated Permit Set
8/9/2021 1:23 PM <dir> Novel RiNo - Design Development Set
12/22/2021 12:38 PM <dir> Novel RiNo - GMP Consolidated Set
8/9/2021 1:12 PM <dir> Novel RiNo - GMP Set
8/9/2021 1:11 PM <dir> Novel RiNo - SD Set
8/9/2021 1:10 PM <dir> Novel Rio - 50-Percent CD Set
8/9/2021 1:09 PM <dir> Novel Rio - Permit - GMP Set
8/9/2021 1:08 PM <dir> Novel Rio Salado - 100-Percent DD Set
8/9/2021 1:07 PM <dir> Novel Rio Salado - 50-Percent DD Set
8/9/2021 1:05 PM <dir> Novel Rio Salado - IFC Set
8/9/2021 1:05 PM <dir> Novel Rio Salado - SD Set
8/9/2021 12:58 PM <dir> Novel River Oaks - Current Running Set
8/9/2021 12:57 PM <dir> Novel River Oaks-Wood
8/9/2021 12:50 PM <dir> Novel Riverwalk - Current Running Set
1/6/2022 1:09 PM <dir> Novel Scotts Addition - 50-Percent CD Set
3/14/2022 10:50 AM <dir> Novel Scotts Addition - 80-Percent CD Set
7/29/2022 9:51 AM <dir> Novel Scotts Addition - 98-Percent CD Set
11/18/2021 11:58 AM <dir> Novel Scotts Addition - DD Package
2/24/2023 11:26 AM <dir> Novel Scotts Addition - IFC Set
9/23/2021 11:05 AM <dir> Novel Scotts Addition - SD Package
8/9/2021 12:46 PM <dir> Novel Scottsdale Quarter
8/9/2021 12:43 PM <dir> Novel South Park
8/9/2021 12:43 PM <dir> Novel Standard Details and Documents REV MAR 2017
8/9/2021 12:31 PM <dir> Novel Stonewall Station-Uptown - 100-Percent CD Set
8/9/2021 12:30 PM <dir> Novel Tampa Bay One - 50-Percent CD Set
8/9/2021 12:28 PM <dir> Novel Tampa Bay One - 65-Percent CD Set
8/9/2021 12:27 PM <dir> Novel Tampa Bay One - DD Set
8/9/2021 12:27 PM <dir> Novel Tampa Bay One - Schematic Design
8/9/2021 12:26 PM <dir> Novel Tryon Place
8/9/2021 12:25 PM <dir> Novel Turtle Creek - 100-Percent DD Set
8/9/2021 12:24 PM <dir> Novel Turtle Creek - DD Set
8/9/2021 12:23 PM <dir> Novel Turtle Creek - IFC Set
8/9/2021 12:22 PM <dir> Novel Turtle Creek - Permit - GMP Set
8/9/2021 12:22 PM <dir> Novel Turtle Creek - Schematic Design Set
8/9/2021 12:22 PM <dir> Novel Two Greenway
8/9/2021 12:21 PM <dir> Novel University Place - 50-Percent CD Submission
1/25/2023 1:33 PM <dir> Novel University Place - Construction Documents
8/9/2021 12:20 PM <dir> Novel University Place - Design Development Set
8/9/2021 12:18 PM <dir> Novel University Place - GMP 2-0 Set
8/9/2021 12:17 PM <dir> Novel University Place - GMP 2.1 Set
8/9/2021 12:16 PM <dir> Novel University Place - GMP Draft
12/15/2021 8:36 AM <dir> Novel University Place - GMP Pricing Set
8/9/2021 12:14 PM <dir> Novel University Place - GMP Set
3/17/2022 12:40 PM <dir> Novel University Place - IFC Set
8/9/2021 12:13 PM <dir> Novel University Place - Permit Set
8/9/2021 12:12 PM <dir> Novel University Place - Progress Set
8/9/2021 12:12 PM <dir> Novel University Place - Schematic Design Set
8/12/2021 8:24 AM <dir> Novel Upper West Side - Current Running Set
4/12/2022 8:48 AM <dir> Novel Uptown - 60-Percent CD GMP Package
9/8/2021 7:48 AM <dir> Novel Uptown - DD Package
10/24/2022 2:51 PM <dir> Novel Uptown - For Construction Set
8/9/2021 12:04 PM <dir> Novel Uptown - Harwood
8/9/2021 12:03 PM <dir> Novel Uptown - Harwood - Coordination Set
8/9/2021 12:03 PM <dir> Novel Uptown - Harwood - Design Development
10/24/2022 7:51 AM <dir> Novel Uptown - IFC Set
8/9/2021 12:00 PM <dir> Novel Val Vista - 80-Percent CD Deliverable
8/9/2021 11:59 AM <dir> Novel Val Vista GMP Set CRESCENT ACCESS ONLY
8/9/2021 11:57 AM <dir> Novel Val Vista Square - 50-Percent CD Set
8/9/2021 11:56 AM <dir> Novel Val Vista Square - Design Development Set
12/8/2021 4:07 PM <dir> Novel Val Vista Square - IFC Set
8/9/2021 11:54 AM <dir> Novel Val Vista Square - Schematic Design Set
8/9/2021 11:52 AM <dir> Novel Village at Research Park - GMP Set
8/9/2021 11:51 AM <dir> Novel Village at Research Park - Permit Set
8/9/2021 11:50 AM <dir> Novel West Midtown - 50-Percent CD Set
8/24/2021 11:52 AM <dir> Novel West Midtown - 98-Percent CD Set
8/9/2021 11:49 AM <dir> Novel West Midtown - DD Package
3/2/2022 9:31 AM <dir> Novel West Midtown - IFC Set
8/24/2021 11:48 AM <dir> Novel West Midtown - Permit GMP Set
8/9/2021 11:46 AM <dir> Novel West Midtown - SD Package
8/9/2021 11:42 AM <dir> Novel Westshore
8/9/2021 11:42 AM <dir> Novel White Fence - 100-Percent DD Set 05-08-19
12/7/2022 1:30 PM <dir> Novel White Fence - IFC Set
8/9/2021 11:39 AM <dir> Novel White Fence - Permit Re-Submital
8/9/2021 11:39 AM <dir> Novel White Fence - Permit Set
12/7/2022 2:24 PM <dir> Novel White Fence - Permit-GMP Set
8/9/2021 11:36 AM <dir> Novel White Fence - Progress Set
8/9/2021 11:36 AM <dir> Novel White Fence - SDP 03-21-19
8/9/2021 11:35 AM <dir> Project 7th Street - GMP Set
8/9/2021 11:34 AM <dir> RD - Westrow
12/28/2021 10:34 AM <dir> Render Martins Crossing - 50-Percent GMP Package
11/17/2022 4:07 PM <dir> Render Martins Crossing - IFC Set
2/6/2023 2:57 PM <dir> Render Prototype - CD Set
8/8/2022 11:49 AM <dir> Render Prototype Drawings
1/23/2023 10:36 AM <dir> Render Sarasota South - IFC Set
9/13/2022 8:16 AM <dir> Render Sarasota South 50-Percent CD and GMP Set
9/26/2022 11:15 AM <dir> Render Stockbridge GA - Design Development Set
12/6/2022 11:21 AM <dir> Render Stockbridge GA - Permit-GMP Review Set
1/23/2023 9:42 AM <dir> Render Stockbridge GA - Permit-GMP Set
9/20/2022 12:30 PM <dir> Render Surprise - Design Development Set
4/1/2022 10:14 AM <dir> Render Weddington Ridge - 50-Percent CD - GMP Set
1/5/2022 12:06 PM <dir> Render Weddington Ridge - Conceptual Set
12/22/2021 12:41 PM <dir> The Yield - Crescent Oakview GMP Set
8/11/2021 2:47 PM <dir> The Yield 1.0
8/23/2022 3:15 PM <dir> The Yield 2.0 - 50-Percent CD Set
7/25/2022 11:53 AM <dir> The Yield 2.0 - Design Development Set
10/11/2022 3:39 PM <dir> The Yield 2.0 - GMP Set
8/9/2021 11:33 AM <dir> Z-Test